Search

Borrow Road bridge

PUBLISHED: 11:32 24 December 2007 | UPDATED: 19:20 05 July 2010

I HAVE written to Bob Blizzard concerning the rat run and consequent damage to the Borrow Road rail bridge at Oulton Broad.

There is a good reason why traffic goes over that bridge; it is to avoid the level crossing.

I HAVE written to Bob Blizzard concerning the rat run and consequent damage to the Borrow Road rail bridge at Oulton Broad.

There is a good reason why traffic goes over that bridge; it is to avoid the level crossing.

I have many times waited five minutes on more than one occasion whilst waiting for a train from Lowestoft to Norwich to go through the level crossing.

I have been there when an ambulance has had its blue lights flashing waiting to get through possibly with someone in urgent need of treatment. It is nothing but a shambles of a crossing.

SYDNEY ASHTON

Church Lane

Oulton Broad


If you value what this story gives you, please consider supporting the Lowestoft Journal. Click the link in the orange box above for details.

Become a supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Latest from the Lowestoft Journal