Search

Update: Lowestoft to Ipswich line reopened after swing bridge fault repaired

PUBLISHED: 11:13 06 December 2014 | UPDATED: 11:42 06 December 2014

Lowestoft station

Lowestoft station

©Archant 2013

The Lowestoft to Ipswich service is running as normal after engineers repaired a fault with the swing bridge at Oulton Broad.

Network Rail engineers were called to the swing bridge this morning and normal services were restored shortly after 11am today.

Rail replacement buses had been operating between Lowestoft and Oulton Broad South stations while the swing bridge was out of action.


If you value what this story gives you, please consider supporting the Lowestoft Journal. Click the link in the yellow box below for details.

Become a supporter

This newspaper has been a central part of community life for many years, through good times and bad, serving as your advocate and trusted source of local information. Our industry is facing testing times, which is why I’m asking for your support. Every single contribution will help us continue to produce award-winning local journalism that makes a measurable difference to our community.

Thank you.

Most Read

Comments have been disabled on this article.

Most Read

Latest from the Lowestoft Journal